Enjoy a hassle-free process with Olerra—we take care of everything from start to finish, making sure your Flex-Flat is permitted, built, and installed without any worries.
20-24 Weeks from Start to Finish
We begin by offering a free property check, which includes a thorough feasibility study and an on-site visit to verify the site conditions. This ensures that your desired Flex-Flat is viable for your location before moving forward, and you'll receive a detailed quote based on the specific requirements of your project.
Once your property's feasibility is confirmed, we begin by preparing and signing a fixed-price contract to lock in the project scope and costs. After the contract is signed, we move into detailed site planning, including soil reports, foundation designs, and initial renderings. We then submit all necessary documentation to navigate the local permit process. Permit approval typically takes six weeks, during which we handle all interactions with local authorities, keeping you informed throughout.
We expertly prepare and submit all necessary documentation to navigate the local permit process, ensuring compliance with regulations. This package is completed within 14 days, minimizing delays and setting the stage for construction.
Permit approval typically takes about six weeks, during which we handle all interactions with local authorities. We keep you informed throughout this period, so you know exactly when your project is ready to move forward.
With permits in hand, we begin the manufacturing of your Flex-Flat in our advanced facility. This phase, which lasts four weeks, focuses on quality craftsmanship and sustainability, ensuring your Flex-Flat is built to last.
While your Flex-Flat is being manufactured, we conduct site preparation, including utilities and foundation work. This simultaneous approach ensures your site is ready for installation as soon as the Flex-Flat is complete.
Free property check with feasibility study.
Detailed quote including:
Two-Contract Process:
Preliminary Contract: Covers feasibility and site planning, including:
ISP Survey, soils report, and foundation design.
Final pricing based on current information.
Preparation of architectural and structural engineering drawings.
Building permit application and submission, ensuring compliance with all local requirements.
Manufacturing & Site Work Contract: Fixed-price contract covering all manufacturing and site work.
5-payment schedule: 25% deposit, 25% at site work start, 25% at delivery, 20% at certificate of occupancy, 5% at final completion.
90% completed unit includes:
Site prep includes:
Excavation, underground utilities, and foundation installation.
Shipping Fully insured and monitored shipping to Colorado.
Installation:
One-day placement using crane on foundation.
Site Work (2 weeks):
Close matelines, roof installation, utility connections, landscaping.
Final Completion (2 weeks):
Final inspection and adjustments to meet Olerra’s standards.
Once manufacturing is complete, we arrange for the secure transport of your Flex-Flat to your property. This process typically takes one week, with every detail carefully planned to ensure safe and timely delivery.
Installation is swift and efficient, taking just one day to place your Flex-Flat on the prepared site. Our team ensures everything is positioned perfectly, setting the stage for the final steps.
Following installation, we complete any remaining site work, such as landscaping and utility hookups. This two-week period ensures that everything is fully functional and integrated into your property.
The final step includes a thorough inspection to ensure every detail meets Olerra’s high standards. We also complete any last adjustments, wrapping up the project within one week to your full satisfaction.
We start with a comprehensive feasibility study, conducted free of charge, to determine the viability of your desired Flex-Flat on your property. This analysis includes zoning, parking requirements, setback allowances, and more, all tailored to your specific location and needs.
Once feasibility is confirmed, we move on to detailed site planning and initial renderings. For a nominal fee, we conduct soil reports, foundation designs, and full bulk plane and shadow analyses to ensure near-certain approval and cost estimation accuracy.
Our expertise extends to navigating complex permit processes, preparing and submitting all necessary documentation, and ensuring compliance with local regulations. This step is crucial for a smooth project continuation and is handled with the utmost attention to detail.
With permits in hand, we initiate the manufacturing of your Flex-Flat in our state-of-the-art facility, ensuring quality and sustainability are at the forefront of production.
Simultaneous site work begins as your Flex-Flat is being crafted, preparing your site for installation. Shipping and installation are meticulously planned to be as unobtrusive and efficient as possible, culminating in a rapid yet thorough final setup and utility connections.
The journey concludes with a detailed inspection to ensure everything meets Olerra's high standards and your full satisfaction, addressing any final tweaks or deficiencies.