A three-story building of stacked Olerra steel modules at the edge of a Colorado mountain town

Olerra Workforce Housing: modular homes for job-site crews

Factory-built steel modules that house crews at remote job sites: private rooms with their own baths, finished on our factory line and moved on when the work does.

See the layouts

From one module to a whole camp.

Every room, building and camp is made from the same factory-built steel module, so the housing grows with the crew.

  1. One moduleFour private rooms, each with its own bath, finished in our factory.
  2. One buildingModules stack up to three stories on both sides of a covered corridor.
  3. A whole campBuildings line a covered walkway, alongside the camp’s shared spaces.
  • ~90% built in our factory
  • 2,000+ workers in one camp

Built for long rotations, not a weekend motel.

Every room is private, with its own bath, a desk and its own heating and cooling. The larger suites add full kitchens.

Rendering of a furnished private workforce room
A private room on the job
Rendering of a suite’s kitchen and living space
Kitchen and living space
Rendering of a studio suite with a sitting area, a small dining table and a kitchenette
A studio suite in the 2BD layout

Workforce rooms to three bedrooms.

A few of the layouts that ship on the same steel module. More are available for projects that need them.

4BD workforce floor plan
4BD workforceFour private rooms, each with a bath and kitchenette.Job-site use · converts
3BD/3BA workforce floor plan
3BD/3BA workforceThree larger rooms, each with a full bath.Job-site use · converts
2BD studio suites floor plan
2BD studio suitesTwo studio suites, each with its own bath and kitchen.Accessible · any story

Concept design, October 2026. Layouts can change before production. Ask our team for the full set.

Drawing of a module on a 53-foot step-deck trailer

Built to move, again and again.

A steel frame built in our factory, shipped finished by truck. Every move repeats the same site cycle, and packing up takes 14 days or less.

  1. Prepare the site
  2. Set the module
  3. Connect
  4. Operate
  5. Disconnect, protect, loadand on to the next site

Who we build it for.

  • Data center constructionHyperscale campuses put thousands of trades where there’s no housing.
  • Military & governmentQuarters for personnel at bases, training areas and public projects, set up fast and moved when the mission changes.
  • Emergency responseStandardized housing for response crews when local infrastructure fails.
  • Mining & energyRemote, multi-year sites where crew sizes change by phase.
  • Infrastructure & manufacturingFabs, battery plants and transmission lines, far from any hotel.

And anywhere else a crew needs a place to live.

Planning crew housing?

Tell us about the project and our workforce housing team will follow up.