An Olerra Flex Flat being set by crane in a Boulder backyard, with the Flatirons behind

The team behind every Olerra ADU.

One team designs, engineers, builds and installs your Flex Flat, start to finish. Here’s who you’ll be working with.

Meet the team
The entry of a finished Olerra Flex Flat, warm wood siding and planted steps

It started with one question.

“How do we make high-quality housing accessible in communities where costs are rising out of reach?”

Brad Ainslie has called Boulder home for decades, and watched the people who make the city work, from young professionals to service workers, get priced out a little more each year. After 25 years across finance, real estate and sustainable infrastructure, he saw that modular construction could close the gap.

In 2023 he founded Olerra Living Innovations to build ADUs that are durable, genuinely luxurious, and priced so a homeowner can actually say yes.

Founded
2023
Home base
Boulder, CO
Leadership experience
25+ yrs

The people on your project.

Design, engineering, permitting, the factory line, the install crew, and the person who answers when you call. Everyone here has a hand in your build.

  • Brad Ainslie

    Brad Ainslie

    Founder & CEO

  • Alex Salamon

    Alex Salamon

    Engineering, Strategy & Processes

  • Renee Golobic

    Renee Golobic

    Architecture, Design & Permitting

  • Cade Bowolick

    Cade Bowolick

    Sales & Business Development

  • George Weber

    Installation & Logistics

  • Jaclyn Dart

    Jaclyn Dart

    Landscape & Design

  • Jose Mendietta

    Jose Mendietta

    Manufacturing & Factory Manager

  • Emily Badeaux

    Emily Badeaux

    Marketing & Digital

One team, every step.

From design and permits to the factory line and final installation, the whole process runs under one roof, with full transparency at every stage.

  1. 1

    Feasibility & design

    We walk your lot, your budget and your goals, then draw a design your city will approve.

  2. 2

    Engineering & permitting

    Structural engineering and the full permit package, carried through your jurisdiction for you.

  3. 3

    Factory build

    Your unit is built on our factory line in about six weeks, steel frame to finished cabinetry, roughly 90% complete before it ships.

  4. 4

    Set, hook‑ups & landscape

    Foundation, transport and a one‑day crane set, then the yard finished so it looks like it was always there.

Most projects run 7–12 months end to end, permits included.

See the Flex Flat models
Olerra Flex Flat modules under construction on the factory line

Roughly 90% of the work on your ADU happens on our factory line, not in your backyard.

≈6‑week factory build ≈90% complete on arrival One‑day set Steel frame · IRC‑built

What homeowners tell us.

The quality is just head and shoulders above everything else we looked at. Incredibly solid. All the finishes, everything really, really high quality.
We were a little worried about whether a new structure in the backyard would clash with our custom home — but the Olerra team helped tie everything together. It feels completely cohesive now, like it was always meant to be here.

The Olerra promise.

More than a building. Every project reflects three core values.

Transparency

Straight numbers and straight answers, from the first estimate to the final walkthrough. No surprises.

Durability

Steel frame, IRC‑built, rated for 165 mph wind and one‑hour fire. Engineered for Colorado winters, for decades.

Luxury made attainable

High‑end finishes at 40–50% less than a site‑built addition, without the hassle.

A finished Olerra Flex Flat with warm wood siding in a Colorado backyard

Let’s build something you’ll love for decades.

Check my property