Arvada’s real rules, taxes and rents — read from the codified ordinance, every figure sourced and dated. Here: a HUD benchmark rent of $1,754/mo for a 1-bed. Run your own numbers below, free.

The ADU rules in Arvada.

Read from the Arvada Land Development Code itself — the operative legal text, not a website summary. Arvada is an HB24-1152 subject jurisdiction: since June 30, 2025, state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval — the local standards below still apply.

Maximum ADU sizeBy lot size: 600 sq ft (lot 6,000 sf or less); 850 (to 12,499 sf); 1,000 (to 1 acre); 1,200 (over 1 acre)verified September 2026Arvada Land Development Code §5-1-5-2
the ordinance text
Table 5-1-5-2: Maximum Floor Area of Accessory Dwelling Unit — Lot Size / Maximum Floor Area: 6,000 sf. or less — 600 sf.; Greater than 6,000 sf. and up to 12,499 sf. — 850 sf.; 12,500 sf. to 1 acre — 1,000 sf.; Greater than 1 acre — 1,200 sf.
Size relative to the main house40% of the principal home's living space; up to 50% if built within the existing home's footprint (incl. basement)verified September 2026Arvada Land Development Code §5-1-5-2
the ordinance text
ADUs shall be: a. No larger than 40 percent of the living space of the principal building; and b. Within the lot size and floor area ranges set out in Table 5-1-5-2 [...] The limitations of Subsection E.1., above, shall not apply to ADUs that are located within the footprint of an existing home as long as the ADU is not larger than 50 percent of the floor area of the principal dwelling unit, including the basement.
Height limit30 ft in R6, R13, R24, and RN-32.5 zoning districts; 25 ft in RN-12.5, RN-7.5, RN-6, and RN-4 (single-family) subdistrictsverified September 2026Arvada Land Development Code §2-1-5-10
the ordinance text
Table 2-1-3-3A: 'Max. Height, ADU (detached) 30 ft. 25 ft. 25 ft. 25 ft. 25 ft. 25 ft. -' (RN-32.5 / RN-12.5 / RN-7.5 / RN-6 / RN-4 / RN-D single-family / RN-D duplex); Tables 2-1-3-4A, 2-1-3-5A, 2-1-3-6A: 'Max. Height, ADU (detached) 30 ft. -' (R6, R13, R24 residential column)
Owner occupancyYes — the owner must occupy either the main house or the ADU (the Director may waive this for temporary absences under one year, after two years of permitted use)verified September 2026Note: Arvada is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Arvada’s code still lists this requirement — confirm with the planning department how it is applied today.Arvada Land Development Code §5-1-5-2
the ordinance text
K. Owner Occupancy. 1. The property owner, as reflected in title records and evidenced by voter registration, vehicle registration or other similar means, must occupy either the principal dwelling unit or ADU. 2. The Director may waive this requirement for temporary absences of less than one year provided that the owner has maintained the permitted use for a minimum of two years and submits proof of the temporary absence.
Extra parking1 (may be tandem with the home's required spaces)verified September 2026Arvada Land Development Code §5-1-5-2
the ordinance text
One on-site parking space shall be required for an ADU, in addition to any required parking for the principal dwelling unit. The required parking space may be in tandem with other required spaces.

Source: Arvada Land Development Code, §5-1-5-2 · ordinance text retrieved 2026-10-08, re-verified September 2026 · open “the ordinance text” under any figure to read the exact sentence it comes from.

What’s different about building in Arvada.

Arvada’s size cap is conditional rather than a single number: by lot size: 600 sq ft (lot 6,000 sf or less); 850 (to 12,499 sf); 1,000 (to 1 acre); 1,200 (over 1 acre) — worth reading closely before sizing a unit.

Owner occupancy: Yes — the owner must occupy either the main house or the ADU (the Director may waive this for temporary absences under one year, after two years of permitted use). Note: Arvada is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Arvada’s code still lists this requirement — confirm with the planning department how it is applied today. Parking: 1 (may be tandem with the home's required spaces).

Olerra factory line where Flex Flats are built

The local math.

What an ADU adds to the tax bill in Arvada, and the federal benchmark for what it rents for.

Example mill levy
97.441
44.349 school · 53.092 local · Jefferson County TAG 1001 · tax year 2025 levy, collected 2026 (not final 2026 levies) · an example, not a parcel quote
Tax per $100K of added value
≈$674/yr
TY2026 assessment rates (7.05% school, 6.80% local) on the latest certified levy (TY2025) — a mixed-year estimate until TY2026 levies are certified
1-bed rent benchmark
$1,754/mo
HUD FY2026 Fair Market Rent, Jefferson County — a benchmark, not a guaranteed rent
2-bed rent benchmark
$2,089/mo
HUD FY2026 Fair Market Rent — actual rents vary by unit and location

Levies: Jefferson County Assessor, 'Tax Authority Information and Reports' — 2025 Tag with Mill Levy All; 2025 Tax Authorities with Mill Levy All; 2024 Tag with Mill Levy and Authorities All (used only to determine which authorities compose each tag code; composition confirmed unchanged for 2025 because summing the 2025 per-authority mills for this exact authority set reproduces the 2025 tag total of 97.4410 exactly) — example: Jefferson County TAG 1001; levies differ between tax areas inside Arvada; check your parcel with the county assessor. Rates: Colorado DOLA, TY2026 — the 10% reduction on the first $700,000 of value applies to the local-government portion, once per property. Rents: HUD Fair Market Rents, huduser.gov.

What an ADU actually costs here.

Two ways to build the same unit in Arvada. Both figures are all-in — design, permits, foundation, utility connections and installation.

Site-built with a general contractor

≈490 sq ft · one-off design, trades at Front Range site rates, 20–35% GC markup, 12–18 months

Typical all-in range
$500,000–$650,000

Published Front Range ranges for a comparable one-off build, 2025–26

Olerra Flex Flat 490 ADU exterior

Flex Flat 490

490 sq ft · Studio, 1 Bedroom, or Studio + 2‑car garage

All-in project range
$300,000–$365,000

≈ $2,100–$2,600 / month fully financed

In Arvada, the 490 needs a main home with at least 1,225 sq ft of living space (the 40% rule)

Olerra Flex Flat 735 ADU exterior

Flex Flat 735

735 sq ft · 2 Bedroom

All-in project range
$420,000–$465,000

≈ $2,800–$3,500 / month fully financed

In Arvada, the 735 needs a lot over 6,000 sq ft and a main home with at least 1,838 sq ft of living space

Olerra ranges: published all-in project pricing, September 2026 — site preparation, foundation, utility connections and permitting included.

Arvada ADU questions, answered.

Are ADUs allowed in Arvada?

Yes. The Arvada Land Development Code permits accessory dwelling units (§5-1-5-2), subject to the size, height, setback and use rules quoted above from the ordinance text. Arvada is also an HB24-1152 subject jurisdiction, so since June 30, 2025 state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval; the local standards above still apply. Zoning district, lot size and setbacks still decide what fits on a specific lot — the free property check confirms yours.

Do I need a permit to build an ADU in Arvada?

Yes. An ADU is a new dwelling unit, so Arvada requires a building permit (plus any zoning or site-plan review the code calls for) before construction starts. Olerra's all-in price includes permitting, and factory-built units are inspected to the same building code as a site-built home.

How big can an ADU be in Arvada?

Per the Arvada Land Development Code: By lot size: 600 sq ft (lot 6,000 sf or less); 850 (to 12,499 sf); 1,000 (to 1 acre); 1,200 (over 1 acre). The Olerra Flex Flat 490 needs a main home with at least 1,225 sq ft of living space (the 40% rule); the 735 needs a lot over 6,000 sq ft and a main home with at least 1,838 sq ft of living space. The free property check confirms what fits on your lot.

Does the owner have to live on the property in Arvada?

Per the ordinance: Yes — the owner must occupy either the main house or the ADU (the Director may waive this for temporary absences under one year, after two years of permitted use).

How much does it cost to build an ADU in Arvada?

A one-off site build with a general contractor typically runs about $500,000–$650,000 for a ~490 sq ft unit. Olerra's factory-built Flex Flats run $300,000–$365,000 (490) and $420,000–$465,000 (735) all-in — site preparation, foundation, utility connections and permitting included.

How much property tax will an ADU add in Arvada?

Roughly $674 per year for every $100,000 of value the ADU adds, in the example tax area shown above: Colorado's TY2026 school (7.05%) and local-government (6.80%) assessment rates on the latest certified (TY2025) levy, a mixed-year estimate. Levies differ between tax areas, so check your parcel with the county assessor.

ADU rules in other Colorado cities.

Same method, each city’s own ordinance. The Colorado hub lists every city, and the statewide ADU calculator covers any Colorado address.

Denver864–1,000 sq ft · 79.6 mills · $1,754/mo HUD rent benchmarkAuroraup to 650 sq ft · 98.2 mills · $1,754/mo HUD rent benchmarkBoulder750–1,000 sq ft · 89.2 mills · $1,795/mo HUD rent benchmarkFort Collins750–1,000 sq ft · 92.7 mills · $1,537/mo HUD rent benchmarkLongmont800+ sq ft · 97.6 mills · $1,795/mo HUD rent benchmarkThornton1,000+ sq ft · 113.4 mills · $1,754/mo HUD rent benchmarkGolden500–800 sq ft · 90.7 mills · $1,754/mo HUD rent benchmarkWheat Ridgeup to 1,000 sq ft · 88.2 mills · $1,754/mo HUD rent benchmarkPuebloup to 800 sq ft · 92.6 mills · $967/mo HUD rent benchmarkMonument750–1,250 sq ft · $1,464/mo HUD rent benchmarkSalida800–1,000 sq ft · 46.1 mills · $1,117/mo HUD rent benchmarkDacono118.2 mills · $1,238/mo HUD rent benchmarkEaton750–1,000 sq ft · 80.0 mills · $1,238/mo HUD rent benchmarkHudsonup to 1,000 sq ft · 87.2 mills · $1,238/mo HUD rent benchmarkLa Salleup to 750 sq ft · 69.7 mills · $1,238/mo HUD rent benchmarkPalmer Lake67.0 mills · $1,464/mo HUD rent benchmarkSuperior750+ sq ft · 105.0 mills · $1,795/mo HUD rent benchmarkSheridan91.5 mills · $1,754/mo HUD rent benchmarkRidgway1,000–1,200 sq ft · 63.2 mills · $1,245/mo HUD rent benchmarkSilverton800+ sq ft · 45.8 mills · $1,119/mo HUD rent benchmarkWestminsterup to 1,200 sq ft · $1,754/mo HUD rent benchmarkBroomfield500–800 sq ft · $1,754/mo HUD rent benchmarkFirestoneup to 900 sq ft · 104.8 mills · $1,238/mo HUD rent benchmarkTimnath850–1,000 sq ft · $1,537/mo HUD rent benchmarkBerthoudup to 850 sq ft · 95.5 mills · $1,537/mo HUD rent benchmark

Learn before you build.

Guides and real Colorado numbers from our team — a fresh pick every couple of weeks, or search for exactly what you need.

Browse all articles

Cite or link this page.

Planning departments and journalists are welcome to reference this data.

Citation line Olerra ADU Cost Calculator — Arvada, CO. Page updated October 9, 2026; rules verified September 2026. https://www.olerra.com/adu-calculator/arvada/
Link HTML <a href="https://www.olerra.com/adu-calculator/arvada/">Arvada ADU rules &amp; costs</a>

Page updated October 9, 2026. The oldest dated figure on the page is from August 25, 2026.

Thinking about an ADU in Arvada?