How to Choose an ADU Contractor in Colorado (Questions to Ask)
How to hire an ADU contractor in Colorado, the questions to ask, the red flags to avoid, how licensing works here, and modular versus site-built compared.

Salida’s real rules, taxes and rents — read from the codified ordinance, every figure sourced and dated. Here: a HUD benchmark rent of $1,117/mo for a 1-bed. Run your own numbers below, free.
Read from the Salida Code Of Ordinances itself — the operative legal text, not a website summary.
| Maximum ADU size | 1,000 sq ft (internal/attached ADU, capped at 800 sq ft above the first floor; or detached ADU 16 ft or less in height); 800 sq ft (detached ADU over 16 ft in height)verified September 2026Salida Code Of Ordinances §16-3-30the ordinance textAn accessory dwelling unit within or attached to the principal dwelling may include no more than one thousand (1,000) square feet of conditioned living space provided that the remainder of the principal dwelling is greater in square footage than the ADU and provided that no more than eight hundred (800) square feet of conditioned living space is located above the first floor. An accessory dwelling unit within a detached accessory building that is sixteen (16) feet or less in total height may include a maximum of one thousand (1,000) square feet of conditioned living space... An accessory dwelling unit within a detached accessory building greater than sixteen (16) feet in total height shall not exceed eight hundred (800) square feet of conditioned living space... |
| Owner occupancy | No. Salida's ADU zoning rules do not require the owner to live on the property.verified October 2026ADUs cannot be sold separately or rented for under 30 days; short-term rentals are not permitted in ADUs.Salida Code Of Ordinances §16-3-30the ordinance textc. Operation and Ownership. An accessory dwelling unit shall not be condominiumized or sold and shall not be rented for periods of less than thirty (30) days. Maximum occupancy is determined per applicable fire code. | 2. Short-term rentals are not permitted in accessory dwelling units at any time in any zone district. | a. Bed and breakfast lodging shall not be allowed in any dwelling unit(s) permitted as an accessory dwelling unit. b. The establishment shall be owner-occupied. |
| Short-term rental | Noverified September 2026Salida Code Of Ordinances §16-3-30the ordinance textAn accessory dwelling unit shall not be condominiumized or sold and shall not be rented for periods of less than thirty (30) days. |
| Extra parking | 1 space, but only required if the lot lacks existing off-street parking, the base zoning district requires off-street parking for all dwellings, or on-street parking is prohibited on that block face; otherwise 0verified September 2026Salida Code Of Ordinances §16-3-30the ordinance textThe City may require one (1) off-street space for the ADU only if: 1. The lot has no existing off-street parking; or 2. The base zoning district requires off-street parking for all dwellings; or 3. On-street parking is prohibited on the block face. |
| Setbacks | 5 ft from the property line for all ADUs (flat setback, not tiered by height)verified September 2026Salida Code Of Ordinances §16-3-30the ordinance textAll ADUs shall be set back a minimum of five (5) feet from the property line. |
Source: Salida Code Of Ordinances, §16-3-30 · ordinance text retrieved 2026-10-08, re-verified October 2026 · open “the ordinance text” under any figure to read the exact sentence it comes from.
Salida’s size cap is conditional rather than a single number: 1,000 sq ft (internal/attached ADU, capped at 800 sq ft above the first floor; or detached ADU 16 ft or less in height); 800 sq ft (detached ADU over 16 ft in height) — worth reading closely before sizing a unit.
Short-term rental of the ADU is not permitted, so the model here is long-term tenancy or family use.
Parking: 1 space, but only required if the lot lacks existing off-street parking, the base zoning district requires off-street parking for all dwellings, or on-street parking is prohibited on that block face; otherwise 0.
Property tax runs lighter than most of the state here: 46.08 mills total in the example tax area (Chaffee County tax area 07), about 49% below the median of the Colorado tax areas we track (levies vary by parcel).
And Salida is one of only 30 Colorado jurisdictions certified ADU Supportive, which makes residents eligible for CHFA’s state-backed ADU financing — an interest-rate buydown and credit enhancement offered through participating lenders. Most of the Front Range doesn’t have this lever.

What an ADU adds to the tax bill in Salida, and the federal benchmark for what it rents for.
Levies: Chaffee County Assessor's Office — 2025 Abstract of Assessment and Levies for Chaffee County (Chaffee County Tax Levies for Tax Year 2025, Collectable in Calendar Year 2026), plus Summary of Levies and Revenue page — example: Chaffee County tax area 07; levies differ between tax areas inside Salida; check your parcel with the county assessor. Rates: Colorado DOLA, TY2026 — the 10% reduction on the first $700,000 of value applies to the local-government portion, once per property. Rents: HUD Fair Market Rents, huduser.gov.
Two ways to build the same unit in Salida. Both figures are all-in — design, permits, foundation, utility connections and installation.
≈490 sq ft · one-off design, trades at Front Range site rates, 20–35% GC markup, 12–18 months
Published Front Range ranges for a comparable one-off build, 2025–26
490 sq ft · Studio, 1 Bedroom, or Studio + 2‑car garage
≈ $2,100–$2,600 / month fully financed
Fits Salida’s size rule
735 sq ft · 2 Bedroom
≈ $2,800–$3,500 / month fully financed
Fits Salida’s size rule
Olerra ranges: published all-in project pricing, September 2026 — site preparation, foundation, utility connections and permitting included.
Permit, utility and tax charges for an ADU depend on your parcel, so we name the agency and link its official schedule rather than guess a number. Olerra’s all-in price already includes them; the calculator below itemizes any amount that has been confirmed.
| Building permit & plan review | Chaffee County Building Department, by contract with the City of SalidaThe fee for a factory-built ADU is not confirmed yet; this agency sets it for your parcel.building permit fee schedule (Community Development schedule effective March 17, 2026) |
| Water & sewer connection | City of SalidaTap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.tap / connection fees |
Official sources checked October 25, 2026. Water, sewer and tap charges also depend on whether the ADU shares the main home’s service — the provider confirms which applies.
Free and specific to you. Want to go further?
Yes. The Salida Code Of Ordinances permits accessory dwelling units (§16-3-30), subject to the size, height, setback and use rules quoted above from the ordinance text. Zoning district, lot size and setbacks still decide what fits on a specific lot — the free property check confirms yours.
Yes. An ADU is a new dwelling unit, so Salida requires a building permit (plus any zoning or site-plan review the code calls for) before construction starts. Building permits for Salida addresses are handled by Chaffee County Building Department, by contract with the City of Salida; water and sewer service come from City of Salida (the local fees table above links their official schedules). Olerra's all-in price includes permitting, and factory-built units are inspected to the same building code as a site-built home.
Per the Salida Code Of Ordinances: 1,000 sq ft (internal/attached ADU, capped at 800 sq ft above the first floor; or detached ADU 16 ft or less in height); 800 sq ft (detached ADU over 16 ft in height). Both Olerra Flex Flats — the 490 and the 735 — fit under this rule. The free property check confirms what fits on your lot.
No — the ordinance does not permit short-term rental of an ADU here, so plan on long-term tenancy or family use.
Per the ordinance: No. Salida's ADU zoning rules do not require the owner to live on the property.
A one-off site build with a general contractor typically runs about $500,000–$650,000 for a ~490 sq ft unit. Olerra's factory-built Flex Flats run $300,000–$365,000 (490) and $420,000–$465,000 (735) all-in — site preparation, foundation, utility connections and permitting included.
Roughly $321 per year for every $100,000 of value the ADU adds (for a home already worth $700,000 or more; a little less below that, because 10% of the first $700,000 of value is exempt from the local portion), in the example tax area shown above: Colorado's TY2026 school (7.05%) and local-government (6.80%) assessment rates on the latest certified (TY2025) levy, a mixed-year estimate. Levies differ between tax areas, so check your parcel with the county assessor.
Same method, each city’s own ordinance. The Colorado hub lists every city, and the statewide ADU calculator covers any Colorado address.
Guides and real Colorado numbers from our team — a fresh pick every couple of weeks, or search for exactly what you need.
Featured ·
How to hire an ADU contractor in Colorado, the questions to ask, the red flags to avoid, how licensing works here, and modular versus site-built compared.
Latest articles
Planning departments and journalists are welcome to reference this data.
Olerra ADU Cost Calculator — Salida, CO. Rules last verified October 25, 2026 against the codified ordinance; tax example: tax year 2025 levy, collected 2026 (Chaffee County tax area 07); page released October 29, 2026. https://www.olerra.com/adu-calculator/salida/ <a href="https://www.olerra.com/adu-calculator/salida/">Salida ADU rules & costs</a> Page released October 29, 2026 · rules last verified October 25, 2026 · the oldest dated figure on the page is from September 3, 2026.

Planning estimates, not quotes or legal advice. Rules, fees, levies and rents change — confirm with the city and your lender before committing. Rules data: codified ordinance as of September 3, 2026, re-verified October 2026. Olerra pricing: published all-in project ranges, September 2026. Corrections: sales@olerra.com.
Built for your location and what you want to do.
We'll be in touch before then — a confirmation is on its way to your email.
Thanks — we’ll reply to your email, usually the same day.
Our team is already on it — here’s what happens next.