Olerra accessory dwelling unit in Colorado

Superior ADU rules, costs & rent (2026)

Superior’s real rules, taxes and rents — read from the codified ordinance, every figure sourced and dated. Here: a HUD benchmark rent of $1,795/mo for a 1-bed. Run your own numbers below, free.

The ADU rules in Superior.

Read from the Superior Municipal Code itself — the operative legal text, not a website summary. Superior is an HB24-1152 subject jurisdiction: since June 30, 2025, state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval — the local standards below still apply.

Maximum ADU sizeThe larger of 750 sq ft or 50% of the principal dwelling unit's square footage, but never more than the principal dwelling unit's square footage.verified October 2026Superior Municipal Code §16-6-160
the ordinance text
The ADU shall be no larger than fifty percent (50%) of the square feet of the principal dwelling unit or 750 square feet, whichever is larger. In no event shall the ADU exceed the square footage of the principal dwelling unit.
Height limitDetached ADU: the maximum height allowed for the principal dwelling unit in the zone, capped at 32 ft (whichever is less). Attached or internal ADU: the maximum height allowed for the principal dwelling unit.verified October 2026Superior Municipal Code §16-6-160
the ordinance text
Maximum height (attached or internal) | Equivalent to the maximum height allowed for the principal dwelling unit | Maximum height (detached) | Equivalent to the maximum height allowed for the principal dwelling unit or 32,' whichever is less
Owner occupancyYes, but only as of the date the ADU permit application is filed (not a continuing occupancy requirement); the requirement does not apply when the ADU is built on a vacant lot.verified September 2026Superior Municipal Code §16-6-160
the ordinance text
The property owner shall reside on the property on the date an application is filed to construct an ADU; provided, however, this requirement does not apply to the construction of an ADU on a vacant lot.
Short-term rentalConditional: only with a Town short-term rental license, and only if Superior is the owner's principal residence; the main home and the ADU can't both be short-term rentals at once, and an owner may run only one (rentals under 30 days)verified October 2026Festival exception (§6-10-110): for Town-declared festival periods only (plus 10 days before and after, at most 29 days per festival), a limited festival license drops the principal-residence requirement and the one-rental-per-owner limit; two short-term rentals in the same dwelling unit stay prohibited. Year-round short-term rentals need the regular license.Superior Municipal Code §6-10-30
the ordinance text
Short-term rental means a residential dwelling unit, or any room therein, or a permitted accessory dwelling unit available for lease for a term of less than thirty (30) consecutive days, excluding bed and breakfasts and accommodation units. | A current, valid license is required for each short-term rental in the Town. | An affidavit, signed by the owner, under penalty of perjury, certifying ... that the owner's principal place of residence is in the Town | Multiple short-term rentals on the same lot or parcel of real property are prohibited. This limitation applies to two (2) or more short-term rentals operating within the same dwelling unit at the same time, or within a dwelling unit and an accessory dwelling unit at the same time. | An owner of a short-term rental shall only operate a single short-term rental in the Town.
Extra parkingNone beyond the main houseverified September 2026Superior Municipal Code §16-6-160
the ordinance text
Parking. Off-street parking is not required.
SetbacksRear: accessory-structure rear setback for the zone district (5 ft if none stated) for detached ADUs; for attached/internal ADUs, the portion of the structure containing the principal dwelling unit must meet the principal-structure rear setback instead. Front and side (interior and street) setbacks follow the principal dwelling unit's setbacks.verified September 2026Superior Municipal Code §16-6-160
the ordinance text
Rear setback Equivalent to the rear setback allowed for accessory structures. If none is stated, then 5'. If the ADU is attached or internal to the principal dwelling, the portion of the structure that contains the principal dwelling unit must maintain the rear setback for principal structures. Front setback Equivalent to the front setback allowed for the principal dwelling unit. Side setback (internal lot line) Side setback (internal) of principal dwelling unit. Side setback (street side) Side setback (street side) of principal dwelling unit.
Water & sewer serviceMust be connected to the main home's water and wastewater utilities and may not have separate connections, unless the Town or the applicable district approves separate connections in writing.verified October 2026Superior Municipal Code §16-6-160
the ordinance text
Utility service. ADUs shall be connected to the water and wastewater utilities of the principal dwelling unit and may not have separate connections, unless the Town or applicable district approves of separate connections in writing.

Source: Superior Municipal Code, §16-6-160 · ordinance text retrieved 2026-08-25, re-verified October 2026 · open “the ordinance text” under any figure to read the exact sentence it comes from.

What’s different about building in Superior.

Superior’s size cap is conditional rather than a single number: The larger of 750 sq ft or 50% of the principal dwelling unit's square footage, but never more than the principal dwelling unit's square footage. — worth reading closely before sizing a unit.

Owner occupancy: Yes, but only as of the date the ADU permit application is filed (not a continuing occupancy requirement); the requirement does not apply when the ADU is built on a vacant lot.

Short-term rental is conditional: only with a Town short-term rental license, and only if Superior is the owner's principal residence; the main home and the ADU can't both be short-term rentals at once, and an owner may run only one (rentals under 30 days). No extra parking is required for the ADU.

Property tax runs heavier than most of the state here: 104.969 mills total in the example tax area (Boulder County tax areas 001447 / 001434), about 17% above the median of the Colorado tax areas we track (levies vary by parcel).

And Superior is one of only 30 Colorado jurisdictions certified ADU Supportive, which makes residents eligible for CHFA’s state-backed ADU financing — an interest-rate buydown and credit enhancement offered through participating lenders. Most of the Front Range doesn’t have this lever.

Olerra factory line where Flex Flats are built

The local math.

What an ADU adds to the tax bill in Superior, and the federal benchmark for what it rents for.

Example mill levy
104.969
48.044 school · 56.925 local · Boulder County tax areas 001447 / 001434 · tax year 2025 levy, collected 2026 (not final 2026 levies) · an example, not a parcel quote
Tax per $100K of added value
≈$726/yr
TY2026 assessment rates (7.05% school, 6.80% local) on the latest certified levy (TY2025) — a mixed-year estimate until TY2026 levies are certified
1-bed rent benchmark
$1,795/mo
HUD FY2026 Fair Market Rent, Boulder County — a benchmark, not a guaranteed rent
2-bed rent benchmark
$2,124/mo
HUD FY2026 Fair Market Rent — actual rents vary by unit and location

Levies: Boulder County Assessor CamaView per-parcel property/tax records (live ArcGIS REST feature services -- CamaView/ParcelPropertyView and CamaView/PropSearch_TAXES at maps.bouldercounty.org -- which are the county's own data source behind its public 'Property Search' tool at https://maps.bouldercounty.org/boco/PropertySearch/); cross-checked against Boulder County Assessor 'Mill Levy Changes 2024 to 2025' workbook (Changes_by_Tax_Area / Changes_by_Authority sheets) — example: Boulder County tax areas 001447 / 001434; levies differ between tax areas inside Superior; check your parcel with the county assessor. Rates: Colorado DOLA, TY2026 — the 10% reduction on the first $700,000 of value applies to the local-government portion, once per property. Rents: HUD Fair Market Rents, huduser.gov.

What an ADU actually costs here.

Two ways to build the same unit in Superior. Both figures are all-in — design, permits, foundation, utility connections and installation.

Site-built with a general contractor

≈490 sq ft · one-off design, trades at Front Range site rates, 20–35% GC markup, 12–18 months

Typical all-in range
$500,000–$650,000

Published Front Range ranges for a comparable one-off build, 2025–26

Olerra Flex Flat 490 ADU exterior

Flex Flat 490

490 sq ft · Studio, 1 Bedroom, or Studio + 2‑car garage

All-in project range
$300,000–$365,000

≈ $2,100–$2,600 / month fully financed

In Superior, the 490 fits if the main home is at least 490 sq ft

Olerra Flex Flat 735 ADU exterior

Flex Flat 735

735 sq ft · 2 Bedroom

All-in project range
$420,000–$465,000

≈ $2,800–$3,500 / month fully financed

In Superior, the 735 fits if the main home is at least 735 sq ft

Olerra ranges: published all-in project pricing, September 2026 — site preparation, foundation, utility connections and permitting included.

Superior ADU questions, answered.

Are ADUs allowed in Superior?

Yes. The Superior Municipal Code permits accessory dwelling units (§16-6-160), subject to the size, height, setback and use rules quoted above from the ordinance text. Superior is also an HB24-1152 subject jurisdiction, so since June 30, 2025 state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval; the local standards above still apply. Zoning district, lot size and setbacks still decide what fits on a specific lot — the free property check confirms yours.

Do I need a permit to build an ADU in Superior?

Yes. An ADU is a new dwelling unit, so Superior requires a building permit (plus any zoning or site-plan review the code calls for) before construction starts. Olerra's all-in price includes permitting, and factory-built units are inspected to the same building code as a site-built home.

How big can an ADU be in Superior?

Per the Superior Municipal Code: The larger of 750 sq ft or 50% of the principal dwelling unit's square footage, but never more than the principal dwelling unit's square footage. The Olerra Flex Flat 490 fits if the main home is at least 490 sq ft; the 735 fits if the main home is at least 735 sq ft. The free property check confirms what fits on your lot.

Can I rent an ADU on Airbnb in Superior?

It depends: Only with a Town short-term rental license, and only if Superior is the owner's principal residence; the main home and the ADU can't both be short-term rentals at once, and an owner may run only one (rentals under 30 days). Festival exception (§6-10-110): for Town-declared festival periods only (plus 10 days before and after, at most 29 days per festival), a limited festival license drops the principal-residence requirement and the one-rental-per-owner limit; two short-term rentals in the same dwelling unit stay prohibited. Year-round short-term rentals need the regular license.

Does the owner have to live on the property in Superior?

Per the ordinance: Yes, but only as of the date the ADU permit application is filed (not a continuing occupancy requirement); the requirement does not apply when the ADU is built on a vacant lot.

How much does it cost to build an ADU in Superior?

A one-off site build with a general contractor typically runs about $500,000–$650,000 for a ~490 sq ft unit. Olerra's factory-built Flex Flats run $300,000–$365,000 (490) and $420,000–$465,000 (735) all-in — site preparation, foundation, utility connections and permitting included.

How much property tax will an ADU add in Superior?

Roughly $726 per year for every $100,000 of value the ADU adds, in the example tax area shown above: Colorado's TY2026 school (7.05%) and local-government (6.80%) assessment rates on the latest certified (TY2025) levy, a mixed-year estimate. Levies differ between tax areas, so check your parcel with the county assessor.

ADU rules in other Colorado cities.

Same method, each city’s own ordinance. The Colorado hub lists every city, and the statewide ADU calculator covers any Colorado address.

Denver864–1,000 sq ft · 79.6 mills · $1,754/mo HUD rent benchmarkAuroraup to 650 sq ft · 98.2 mills · $1,754/mo HUD rent benchmarkBoulder750–1,000 sq ft · 89.2 mills · $1,795/mo HUD rent benchmarkFort Collins750–1,000 sq ft · 92.7 mills · $1,537/mo HUD rent benchmarkLongmont800+ sq ft · 97.6 mills · $1,795/mo HUD rent benchmarkThornton1,000+ sq ft · 113.4 mills · $1,754/mo HUD rent benchmarkArvada600–1,200 sq ft · 97.4 mills · $1,754/mo HUD rent benchmarkGolden500–800 sq ft · 90.7 mills · $1,754/mo HUD rent benchmarkWheat Ridgeup to 1,000 sq ft · 88.2 mills · $1,754/mo HUD rent benchmarkPuebloup to 800 sq ft · 92.6 mills · $967/mo HUD rent benchmarkMonument750–1,250 sq ft · $1,464/mo HUD rent benchmarkSalida800–1,000 sq ft · 46.1 mills · $1,117/mo HUD rent benchmarkDacono118.2 mills · $1,238/mo HUD rent benchmarkEaton750–1,000 sq ft · 80.0 mills · $1,238/mo HUD rent benchmarkHudsonup to 1,000 sq ft · 87.2 mills · $1,238/mo HUD rent benchmarkLa Salleup to 750 sq ft · 69.7 mills · $1,238/mo HUD rent benchmarkPalmer Lake67.0 mills · $1,464/mo HUD rent benchmarkSheridan91.5 mills · $1,754/mo HUD rent benchmarkRidgway1,000–1,200 sq ft · 63.2 mills · $1,245/mo HUD rent benchmarkSilverton800+ sq ft · 45.8 mills · $1,119/mo HUD rent benchmarkWestminsterup to 1,200 sq ft · $1,754/mo HUD rent benchmarkBroomfield500–800 sq ft · $1,754/mo HUD rent benchmarkFirestoneup to 900 sq ft · 104.8 mills · $1,238/mo HUD rent benchmarkTimnath850–1,000 sq ft · $1,537/mo HUD rent benchmarkBerthoudup to 850 sq ft · 95.5 mills · $1,537/mo HUD rent benchmark

Learn before you build.

Guides and real Colorado numbers from our team — a fresh pick every couple of weeks, or search for exactly what you need.

Browse all articles

Cite or link this page.

Planning departments and journalists are welcome to reference this data.

Citation line Olerra ADU Cost Calculator — Superior, CO. Page updated October 9, 2026; rules verified October 2026. https://www.olerra.com/adu-calculator/superior/
Link HTML <a href="https://www.olerra.com/adu-calculator/superior/">Superior ADU rules &amp; costs</a>

Page updated October 9, 2026. The oldest dated figure on the page is from August 25, 2026.

Thinking about an ADU in Superior?