Olerra accessory dwelling unit in Colorado

Hudson ADU rules, costs & rent (2026)

Hudson’s real rules, taxes and rents — read from the codified ordinance, every figure sourced and dated. Here: a HUD benchmark rent of $1,238/mo for a 1-bed. Run your own numbers below, free.

The ADU rules in Hudson.

Read from the Hudson Municipal Code itself — the operative legal text, not a website summary. Hudson is an HB24-1152 subject jurisdiction: since June 30, 2025, state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval — the local standards below still apply.

Maximum ADU size1,000 sqft (baseline); if converting an existing attic or basement to the ADU, the cap is the larger of 1,000 sqft or the area of that attic/basementverified September 2026Hudson Municipal Code §16-62
the ordinance text
The ADU shall not exceed one thousand (1,000) feet in gross floor area, or the area of any attic or basement that is being converted to an ADU, whichever is larger.
Owner occupancyYesverified September 2026Note: Hudson is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Hudson’s code still lists this requirement — confirm with the planning department how it is applied today.Hudson Municipal Code §16-62
the ordinance text
Either the ADU or the primary residence shall be permanently occupied by the owner of the lot... If at any time the owner occupies neither the primary residence nor the ADU, the ADU shall not be used or occupied as a dwelling unit and shall not be rented.
SetbacksRear 5 (minimum, or the principal dwelling's required rear setback if greater); side: whichever is less restrictive of the accessory-structure or principal-dwelling side setback (no fixed ft given)verified September 2026Hudson Municipal Code §16-62
the ordinance text
Each ADU shall conform to all minimum rear setback dimensional standards applicable to the principal single-household detached dwelling on the lot, or shall have a minimum rear setback of five (5) feet, whichever is greater.

Source: Hudson Municipal Code, §16-62 · ordinance text retrieved 2026-10-08, re-verified September 2026 · open “the ordinance text” under any figure to read the exact sentence it comes from.

What’s different about building in Hudson.

Hudson’s size cap is conditional rather than a single number: 1,000 sqft (baseline); if converting an existing attic or basement to the ADU, the cap is the larger of 1,000 sqft or the area of that attic/basement — worth reading closely before sizing a unit.

Owner occupancy: yes. Note: Hudson is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Hudson’s code still lists this requirement — confirm with the planning department how it is applied today.

Finished Olerra ADU with warm wood cladding

The local math.

What an ADU adds to the tax bill in Hudson, and the federal benchmark for what it rents for.

Example mill levy
87.157
15.822 school · 71.335 local · Weld County tax area 0307 · tax year 2025 levy, collected 2026 (not final 2026 levies) · an example, not a parcel quote
Tax per $100K of added value
≈$597/yr
TY2026 assessment rates (7.05% school, 6.80% local) on the latest certified levy (TY2025) — a mixed-year estimate until TY2026 levies are certified
1-bed rent benchmark
$1,238/mo
HUD FY2026 Fair Market Rent, Weld County — a benchmark, not a guaranteed rent
2-bed rent benchmark
$1,563/mo
HUD FY2026 Fair Market Rent — actual rents vary by unit and location

Levies: Weld County Assessor, 2025 Mill Levy Report (Tax District and Authority Report) — example: Weld County tax area 0307; levies differ between tax areas inside Hudson; check your parcel with the county assessor. Rates: Colorado DOLA, TY2026 — the 10% reduction on the first $700,000 of value applies to the local-government portion, once per property. Rents: HUD Fair Market Rents, huduser.gov.

What an ADU actually costs here.

Two ways to build the same unit in Hudson. Both figures are all-in — design, permits, foundation, utility connections and installation.

Site-built with a general contractor

≈490 sq ft · one-off design, trades at Front Range site rates, 20–35% GC markup, 12–18 months

Typical all-in range
$500,000–$650,000

Published Front Range ranges for a comparable one-off build, 2025–26

Olerra Flex Flat 490 ADU exterior

Flex Flat 490

490 sq ft · Studio, 1 Bedroom, or Studio + 2‑car garage

All-in project range
$300,000–$365,000

≈ $2,100–$2,600 / month fully financed

Fits Hudson’s size rule

Olerra Flex Flat 735 ADU exterior

Flex Flat 735

735 sq ft · 2 Bedroom

All-in project range
$420,000–$465,000

≈ $2,800–$3,500 / month fully financed

Fits Hudson’s size rule

Olerra ranges: published all-in project pricing, September 2026 — site preparation, foundation, utility connections and permitting included.

Hudson ADU questions, answered.

Are ADUs allowed in Hudson?

Yes. The Hudson Municipal Code permits accessory dwelling units (§16-62), subject to the size, height, setback and use rules quoted above from the ordinance text. Hudson is also an HB24-1152 subject jurisdiction, so since June 30, 2025 state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval; the local standards above still apply. Zoning district, lot size and setbacks still decide what fits on a specific lot — the free property check confirms yours.

Do I need a permit to build an ADU in Hudson?

Yes. An ADU is a new dwelling unit, so Hudson requires a building permit (plus any zoning or site-plan review the code calls for) before construction starts. Olerra's all-in price includes permitting, and factory-built units are inspected to the same building code as a site-built home.

How big can an ADU be in Hudson?

Per the Hudson Municipal Code: 1,000 sqft (baseline); if converting an existing attic or basement to the ADU, the cap is the larger of 1,000 sqft or the area of that attic/basement. Both Olerra Flex Flats — the 490 and the 735 — fit under this rule. The free property check confirms what fits on your lot.

Does the owner have to live on the property in Hudson?

Yes — the owner must live in either the main house or the ADU. Note: Hudson is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Hudson's code still lists this requirement, so confirm with the planning department how it is applied today.

How much does it cost to build an ADU in Hudson?

A one-off site build with a general contractor typically runs about $500,000–$650,000 for a ~490 sq ft unit. Olerra's factory-built Flex Flats run $300,000–$365,000 (490) and $420,000–$465,000 (735) all-in — site preparation, foundation, utility connections and permitting included.

How much property tax will an ADU add in Hudson?

Roughly $597 per year for every $100,000 of value the ADU adds, in the example tax area shown above: Colorado's TY2026 school (7.05%) and local-government (6.80%) assessment rates on the latest certified (TY2025) levy, a mixed-year estimate. Levies differ between tax areas, so check your parcel with the county assessor.

ADU rules in other Colorado cities.

Same method, each city’s own ordinance. The Colorado hub lists every city, and the statewide ADU calculator covers any Colorado address.

Denver864–1,000 sq ft · 79.6 mills · $1,754/mo HUD rent benchmarkAuroraup to 650 sq ft · 98.2 mills · $1,754/mo HUD rent benchmarkBoulder750–1,000 sq ft · 89.2 mills · $1,795/mo HUD rent benchmarkFort Collins750–1,000 sq ft · 92.7 mills · $1,537/mo HUD rent benchmarkLongmont800+ sq ft · 97.6 mills · $1,795/mo HUD rent benchmarkThornton1,000+ sq ft · 113.4 mills · $1,754/mo HUD rent benchmarkArvada600–1,200 sq ft · 97.4 mills · $1,754/mo HUD rent benchmarkGolden500–800 sq ft · 90.7 mills · $1,754/mo HUD rent benchmarkWheat Ridgeup to 1,000 sq ft · 88.2 mills · $1,754/mo HUD rent benchmarkPuebloup to 800 sq ft · 92.6 mills · $967/mo HUD rent benchmarkMonument750–1,250 sq ft · $1,464/mo HUD rent benchmarkSalida800–1,000 sq ft · 46.1 mills · $1,117/mo HUD rent benchmarkDacono118.2 mills · $1,238/mo HUD rent benchmarkEaton750–1,000 sq ft · 80.0 mills · $1,238/mo HUD rent benchmarkLa Salleup to 750 sq ft · 69.7 mills · $1,238/mo HUD rent benchmarkPalmer Lake67.0 mills · $1,464/mo HUD rent benchmarkSuperior750+ sq ft · 105.0 mills · $1,795/mo HUD rent benchmarkSheridan91.5 mills · $1,754/mo HUD rent benchmarkRidgway1,000–1,200 sq ft · 63.2 mills · $1,245/mo HUD rent benchmarkSilverton800+ sq ft · 45.8 mills · $1,119/mo HUD rent benchmarkWestminsterup to 1,200 sq ft · $1,754/mo HUD rent benchmarkBroomfield500–800 sq ft · $1,754/mo HUD rent benchmarkFirestoneup to 900 sq ft · 104.8 mills · $1,238/mo HUD rent benchmarkTimnath850–1,000 sq ft · $1,537/mo HUD rent benchmarkBerthoudup to 850 sq ft · 95.5 mills · $1,537/mo HUD rent benchmark

Learn before you build.

Guides and real Colorado numbers from our team — a fresh pick every couple of weeks, or search for exactly what you need.

Browse all articles

Cite or link this page.

Planning departments and journalists are welcome to reference this data.

Citation line Olerra ADU Cost Calculator — Hudson, CO. Page updated October 9, 2026; rules verified September 2026. https://www.olerra.com/adu-calculator/hudson/
Link HTML <a href="https://www.olerra.com/adu-calculator/hudson/">Hudson ADU rules &amp; costs</a>

Page updated October 9, 2026. The oldest dated figure on the page is from August 25, 2026.