How to Choose an ADU Contractor in Colorado (Questions to Ask)
How to hire an ADU contractor in Colorado, the questions to ask, the red flags to avoid, how licensing works here, and modular versus site-built compared.

Severance’s real rules, taxes and rents — read from the codified ordinance, every figure sourced and dated. Here: a HUD benchmark rent of $1,238/mo for a 1-bed. Run your own numbers below, free.
Read from the Severance Municipal Code itself — the operative legal text, not a website summary. Severance is an HB24-1152 subject jurisdiction: since June 30, 2025, state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval — the local standards below still apply.
| Maximum ADU size | No fixed square-foot cap: an ADU may be no larger than the principal dwelling unit on the same lotverified November 2026Severance Municipal Code §16.3.530the ordinance text(10) The size of an accessory dwelling unit shall be no larger than the size of the principal dwelling unit on the same lot as the accessory dwelling unit. |
| Owner occupancy | No owner-occupancy requirement in the ADU section (the code is silent on owner residency)verified November 2026Severance Municipal Code §16.3.530the ordinance textSec. 16.3.530 (the whole ADU section, Ord. 2025-15) sets no owner-residency rule; its only ownership text is (e)(3): "No portion of a structure containing an accessory dwelling may have ownership different from the ownership of the principal dwelling unit." |
| Setbacks | Suburban Perimeter, Town Core, Development Node zones: front behind the front of the principal dwelling; side 7.5 ft; corner side 15 ft; rear 15 ft (uniform ADU-specific standard). Rural Residential zone (where ADUs are also a use by right): no ADU-specific setback is listed; the general Accessory Building line in the Rural Residential table shows front 25 ft, side 5 ft, rear 5 ft — different from the other three zones, and its applicability to ADUs is not made explicit in the ordinance.verified September 2026Severance Municipal Code §16.3.530the ordinance textTable 16.3.105. Rural Residential Setback Criteria Principal Residence Accessory Building Front setback 25 feet 25 feet Side setback 7.5 feet 5 feet Rear setback 30 feet 5 feet | Sec. 16.3.110. - Land uses. (a) Uses by right. ... Residential land uses include the following: Accessory dwelling. ... | Table 16.3.220 (and identically 16.3.320, 16.3.420): Accessory dwelling unit n/a n/a Behind the front of a principal dwelling 7.5 feet 15 feet 15 feet 2 stories |
Source: Severance Municipal Code, §16.3.530 · ordinance text retrieved 2026-11-05, re-verified November 2026 · open “the ordinance text” under any figure to read the exact sentence it comes from.
Severance’s size cap is conditional rather than a single number: No fixed square-foot cap: an ADU may be no larger than the principal dwelling unit on the same lot — worth reading closely before sizing a unit.

What an ADU adds to the tax bill in Severance, and the federal benchmark for what it rents for.
Levies: Weld County Assessor, 2025 Mill Levy Report (Tax District and Authority Report) — example: Weld County tax area 0434; levies differ between tax areas inside Severance; check your parcel with the county assessor. Rates: Colorado DOLA, TY2026 — the 10% reduction on the first $700,000 of value applies to the local-government portion, once per property. Rents: HUD Fair Market Rents, huduser.gov.
Two ways to build the same unit in Severance. Both figures are all-in — design, permits, foundation, utility connections and installation.
≈490 sq ft · one-off design, trades at Front Range site rates, 20–35% GC markup, 12–18 months
Published Front Range ranges for a comparable one-off build, 2025–26
490 sq ft · Studio, 1 Bedroom, or Studio + 2‑car garage
≈ $2,100–$2,600 / month fully financed
In Severance, the 490 fits if the main home is at least 490 sq ft (an ADU can be no larger than the main home)
735 sq ft · 2 Bedroom
≈ $2,800–$3,500 / month fully financed
In Severance, the 735 fits if the main home is at least 735 sq ft (an ADU can be no larger than the main home)
Olerra ranges: published all-in project pricing, September 2026 — site preparation, foundation, utility connections and permitting included.
Permit, utility and tax charges for an ADU depend on your parcel, so we name the agency and link its official schedule rather than guess a number. Olerra’s all-in price already includes them; the calculator below itemizes any amount that has been confirmed.
| Building permit & plan review | Severance Building Department (inspections by SAFEbuilt)The fee for a factory-built ADU is not confirmed yet; this agency sets it for your parcel.building department |
| Water & sewer connection | Town of Severance — serves most of townTap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.tap / connection fees |
| Water connection | North Weld County Water District — serves part of town (depends on your address)Tap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.tap / connection fees |
| Sewer connection | Saddler Ridge Metro District — serves part of town (depends on your address)Tap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.provider website |
| Construction use tax | Severance taxes building materialsWhether it applies to a factory-built ADU, and its rate and taxable basis, are not confirmed yet.use tax information |
Official sources checked November 8, 2026. Water, sewer and tap charges also depend on whether the ADU shares the main home’s service — the provider confirms which applies.
Free and specific to you. Want to go further?
Yes. The Severance Municipal Code permits accessory dwelling units (§16.3.530), subject to the size, height, setback and use rules quoted above from the ordinance text. Severance is also an HB24-1152 subject jurisdiction, so since June 30, 2025 state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval; the local standards above still apply. Zoning district, lot size and setbacks still decide what fits on a specific lot — the free property check confirms yours.
Yes. An ADU is a new dwelling unit, so Severance requires a building permit (plus any zoning or site-plan review the code calls for) before construction starts. Building permits for Severance addresses are handled by Severance Building Department (inspections by SAFEbuilt); water providers include Town of Severance and North Weld County Water District, depending on your address; sewer providers include Town of Severance and Saddler Ridge Metro District, depending on your address (the local fees table above links their official schedules). Olerra's all-in price includes permitting, and factory-built units are inspected to the same building code as a site-built home.
Per the Severance Municipal Code: No fixed square-foot cap: an ADU may be no larger than the principal dwelling unit on the same lot. The Olerra Flex Flat 490 fits if the main home is at least 490 sq ft (an ADU can be no larger than the main home); the 735 fits if the main home is at least 735 sq ft (an ADU can be no larger than the main home). The free property check confirms what fits on your lot.
Per the ordinance: No owner-occupancy requirement in the ADU section (the code is silent on owner residency).
A one-off site build with a general contractor typically runs about $500,000–$650,000 for a ~490 sq ft unit. Olerra's factory-built Flex Flats run $300,000–$365,000 (490) and $420,000–$465,000 (735) all-in — site preparation, foundation, utility connections and permitting included.
Roughly $658 per year for every $100,000 of value the ADU adds (for a home already worth $700,000 or more; a little less below that, because 10% of the first $700,000 of value is exempt from the local portion), in the example tax area shown above: Colorado's TY2026 school (7.05%) and local-government (6.80%) assessment rates on the latest certified (TY2025) levy, a mixed-year estimate. Levies differ between tax areas, so check your parcel with the county assessor.
Same method, each city’s own ordinance. The Colorado hub lists every city, and the statewide ADU calculator covers any Colorado address.
Guides and real Colorado numbers from our team — a fresh pick every couple of weeks, or search for exactly what you need.
Featured ·
How to hire an ADU contractor in Colorado, the questions to ask, the red flags to avoid, how licensing works here, and modular versus site-built compared.
Latest articles
Planning departments and journalists are welcome to reference this data.
Olerra ADU Cost Calculator — Severance, CO. Rules last verified November 5, 2026 against the codified ordinance; tax example: tax year 2025 levy, collected 2026 (Weld County tax area 0434); page released November 17, 2026. https://www.olerra.com/adu-calculator/severance/ <a href="https://www.olerra.com/adu-calculator/severance/">Severance ADU rules & costs</a> Page released November 17, 2026 · rules last verified November 5, 2026 · the oldest dated figure on the page is from August 25, 2026.

Planning estimates, not quotes or legal advice. Rules, fees, levies and rents change — confirm with the city and your lender before committing. Rules data: codified ordinance as of August 25, 2026, re-verified November 2026. Olerra pricing: published all-in project ranges, September 2026. Corrections: sales@olerra.com.
Built for your location and what you want to do.
We'll be in touch before then — a confirmation is on its way to your email.
Thanks — we’ll reply to your email, usually the same day.
Our team is already on it — here’s what happens next.