How to Choose an ADU Contractor in Colorado (Questions to Ask)
How to hire an ADU contractor in Colorado, the questions to ask, the red flags to avoid, how licensing works here, and modular versus site-built compared.

Federal Heights’s real rules, taxes and rents — read from the codified ordinance, every figure sourced and dated. Here: ADUs up to 800 sq ft, a HUD benchmark rent of $1,754/mo for a 1-bed. Run your own numbers below, free.
Read from the Federal Heights Code Of Ordinances itself — the operative legal text, not a website summary. Federal Heights is an HB24-1152 subject jurisdiction: since June 30, 2025, state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval — the local standards below still apply.
| Maximum ADU size | 800 sq ftverified September 2026Federal Heights Code Of Ordinances §70-926the ordinance text(a)(2) Interior accessory dwelling units are limited to 800 square feet in area. | (b)(2) Attached accessory dwelling units are limited to 800 square feet in area. | (c)(5) Detached accessory dwelling units are limited to 800 square feet in area. (Ord. No. 25-07, § 1, 7-1-2025) |
| Owner occupancy | Yes — the owner must live in the main house to add an ADU, and must live on the property to rent the ADU outverified September 2026Note: Federal Heights is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Federal Heights’s code still lists this requirement — confirm with the planning department how it is applied today.Federal Heights Code Of Ordinances ARTICLE XVI - ACCESSORY DWELLING UNITSthe ordinance textThe city shall require evidence that the principal dwelling on the site of the proposed ADU is occupied by the owner of the lot in the following situations: (1) When an application is submitted to construct a new ADU on a lot that already contains a single-family detached dwelling, or to convert part of an existing single-family detached dwelling into an ADU. / Rentals of accessory dwelling units are not permitted unless the property owner occupies one dwelling unit on the property... |
| Setbacks | Side 5; rear 5 (plus 6 in. per ft of height over 15 ft) to lot line; plus 5 ft internal setback from principal dwelling -- detached ADUsverified September 2026Federal Heights Code Of Ordinances ARTICLE XVI - ACCESSORY DWELLING UNITSthe ordinance textMinimum side and rear setbacks are five feet to lot line, with an additional six inches of side and rear setback for every foot of height over 15 feet. / Minimum internal setback between the accessory dwelling unit and the single-family dwelling unit on the same lot is five feet. |
Source: Federal Heights Code Of Ordinances, §70-926 · ordinance text retrieved 2026-11-05, re-verified September 2026 · open “the ordinance text” under any figure to read the exact sentence it comes from.
Federal Heights caps an ADU at 800 sq ft. Owner occupancy: Yes — the owner must live in the main house to add an ADU, and must live on the property to rent the ADU out. Note: Federal Heights is an HB24-1152 subject jurisdiction. Since June 30, 2025, state law limits these cities to confirming that the owner lives on the lot when the ADU application is filed (and to regulating short-term rentals). Federal Heights’s code still lists this requirement — confirm with the planning department how it is applied today.
Property tax runs heavier than most of the state here: 108.983 mills total in the example tax area (Adams County tax area 1167), about 20% above the median of the Colorado tax areas we track (levies vary by parcel).

What an ADU adds to the tax bill in Federal Heights, and the federal benchmark for what it rents for.
Levies: Adams County Assessor, Tax District Report (tax area 1167) — example: Adams County tax area 1167 (about 93% of the city's single-family homes; the roughly 7% in the Westminster Public Schools area (tax area 1550) pay about 95.7 mills); levies differ between tax areas inside Federal Heights; check your parcel with the county assessor. Rates: Colorado DOLA, TY2026 — the 10% reduction on the first $700,000 of value applies to the local-government portion, once per property. Rents: HUD Fair Market Rents, huduser.gov.
Two ways to build the same unit in Federal Heights. Both figures are all-in — design, permits, foundation, utility connections and installation.
≈490 sq ft · one-off design, trades at Front Range site rates, 20–35% GC markup, 12–18 months
Published Front Range ranges for a comparable one-off build, 2025–26
490 sq ft · Studio, 1 Bedroom, or Studio + 2‑car garage
≈ $2,100–$2,600 / month fully financed
Fits Federal Heights’s size rule
735 sq ft · 2 Bedroom
≈ $2,800–$3,500 / month fully financed
Fits Federal Heights’s size rule
Olerra ranges: published all-in project pricing, September 2026 — site preparation, foundation, utility connections and permitting included.
Permit, utility and tax charges for an ADU depend on your parcel, so we name the agency and link its official schedule rather than guess a number. Olerra’s all-in price already includes them; the calculator below itemizes any amount that has been confirmed.
| Building permit & plan review | Federal Heights Building Department (electrical permits: State of Colorado)The fee for a factory-built ADU is not confirmed yet; this agency sets it for your parcel.building permit fee schedule |
| Water & sewer connection | City of Federal HeightsTap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.tap / connection fees |
| Water connection | City of WestminsterTap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.provider website |
| Sewer connection | City of Thornton / Metro Water RecoveryTap and connection charges for an ADU are not confirmed yet; they differ if the ADU shares the main home’s service.provider website |
| Construction use tax | Federal Heights taxes building materialsWhether it applies to a factory-built ADU, and its rate and taxable basis, are not confirmed yet.use tax information |
Official sources checked November 8, 2026. Water, sewer and tap charges also depend on whether the ADU shares the main home’s service — the provider confirms which applies.
Free and specific to you. Want to go further?
Yes. The Federal Heights Code Of Ordinances permits accessory dwelling units (§70-926), subject to the size, height, setback and use rules quoted above from the ordinance text. Federal Heights is also an HB24-1152 subject jurisdiction, so since June 30, 2025 state law requires it to allow an ADU wherever it allows a single-family home, with administrative approval; the local standards above still apply. Zoning district, lot size and setbacks still decide what fits on a specific lot — the free property check confirms yours.
Yes. An ADU is a new dwelling unit, so Federal Heights requires a building permit (plus any zoning or site-plan review the code calls for) before construction starts. Building permits for Federal Heights addresses are handled by Federal Heights Building Department (electrical permits: State of Colorado); water providers include City of Federal Heights and City of Westminster, depending on your address; sewer providers include City of Federal Heights and City of Thornton / Metro Water Recovery, depending on your address (the local fees table above links their official schedules). Olerra's all-in price includes permitting, and factory-built units are inspected to the same building code as a site-built home.
Per the Federal Heights Code Of Ordinances: 800 sq ft. Both Olerra Flex Flats — the 490 and the 735 — fit under this rule. The free property check confirms what fits on your lot.
Per the ordinance: Yes — the owner must live in the main house to add an ADU, and must live on the property to rent the ADU out.
A one-off site build with a general contractor typically runs about $500,000–$650,000 for a ~490 sq ft unit. Olerra's factory-built Flex Flats run $300,000–$365,000 (490) and $420,000–$465,000 (735) all-in — site preparation, foundation, utility connections and permitting included.
Roughly $759 per year for every $100,000 of value the ADU adds (for a home already worth $700,000 or more; a little less below that, because 10% of the first $700,000 of value is exempt from the local portion), in the example tax area shown above: Colorado's TY2026 school (7.05%) and local-government (6.80%) assessment rates on the latest certified (TY2025) levy, a mixed-year estimate. Levies differ between tax areas, so check your parcel with the county assessor.
Same method, each city’s own ordinance. The Colorado hub lists every city, and the statewide ADU calculator covers any Colorado address.
Guides and real Colorado numbers from our team — a fresh pick every couple of weeks, or search for exactly what you need.
Featured ·
How to hire an ADU contractor in Colorado, the questions to ask, the red flags to avoid, how licensing works here, and modular versus site-built compared.
Latest articles
Planning departments and journalists are welcome to reference this data.
Olerra ADU Cost Calculator — Federal Heights, CO. Rules last verified November 5, 2026 against the codified ordinance; tax example: tax year 2025 levy, collected 2026 (Adams County tax area 1167); page released November 17, 2026. https://www.olerra.com/adu-calculator/federal-heights/ <a href="https://www.olerra.com/adu-calculator/federal-heights/">Federal Heights ADU rules & costs</a> Page released November 17, 2026 · rules last verified November 5, 2026 · the oldest dated figure on the page is from August 25, 2026.

Planning estimates, not quotes or legal advice. Rules, fees, levies and rents change — confirm with the city and your lender before committing. Rules data: codified ordinance as of August 25, 2026, re-verified September 2026. Olerra pricing: published all-in project ranges, September 2026. Corrections: sales@olerra.com.
Built for your location and what you want to do.
We'll be in touch before then — a confirmation is on its way to your email.
Thanks — we’ll reply to your email, usually the same day.
Our team is already on it — here’s what happens next.